18 to 24 months
of one-on-one supervision before a new engineer is safe on a live panel.
Voltheia watches engineers practise on real equipment, explains each step, catches mistakes as they happen, and certifies who is ready for live work.
Lead is on terminal 5B. Move it to 1A before injecting.
of one-on-one supervision before a new engineer is safe on a live panel.
is the supervisor, pulled off live work to stand next to a trainee.
That generation is leaving the industry, and their know-how leaves with them.
Engineers train on our Secondary Injection Test Set, the same equipment they carry onto live sites.
Voltheia Specialist watches through a camera, knows which step the engineer is on, and talks them through mistakes as they happen.
Every session ends in a Technical Readiness Score: a pass or fail record for each step, before anyone touches live equipment.
It gets better with every session.
Results endorsed by licensed professional engineers in Singapore.
Their way of doing each procedure becomes the standard every new engineer is trained and scored against. Voltheia does the supervising, and they go back to live work.
Available now Secondary injection relay testing
Next Primary injection testing
Voltheia started inside a working 22kV engineering firm. Our CEO trained every new engineer there for three years, and two of those trainees are now our cofounders. The team pairs that field experience with years of building vision AI for defence and shipping production AI in San Francisco.

Built the test set and wrote the training curriculum. Co-owns a 22kV power engineering firm and previously worked on Singapore's national extra high voltage grid.

Leads the AI and the platform. Repeat founder who ships production AI in San Francisco.

Leads hardware and camera systems. Builds on-device vision systems for a Singapore defence programme.

Builds the vision models behind the AI instructor.
Book a 20-minute demo. We'll show you a live session and the readiness score it produces.
Book a demo